2010 Europe

Outage lead Major inspection 5 GE Frame 9E engines, Europe. Training and advising client during the overhaul which was performed by GE.

Mejoremos juntos su rentabilidad

Reduzca el tiempo de inactividad de sus turbinas y disminuya su coste total de propiedad.